top of page

ts1-1

ts1-1
1/1
Villas Lift Station
Highland Park, IL
Overview
Replacement of pumps and pump controls, coating of the wet well, valve vault, and piping, and installation of a new natural gas engine generator.
Challeneges
Unique challenges in bypass pumping and impacts to residents. The upstream manhole is located within a driveway across a roadway and traditional bypass pumping would involve disruption to residential traffic and the use of a private driveway.
Successes
Coordination with the client, contractor, and residents led to an innovative solution to traditional bypass pumping that eliminated the need for the bypass pumping hose to be installed in a roadway and minimized impacts to the resident’s driveway.
Years: 2022-23
Key Team Members: Diane Moeller, Paul Ruscko

villas lift station_edited

villas lift station_edited
1/1