Highland Park - Villas Lift Station

​

The Villas Lift Station project in Highland Park, IL involved the replacement of pumps and pump controls, coating of the wet well, valve vault, and piping, and installation of a new natural gas engine generator. The project presented unique challenges in bypass pumping and impacts to residents, as the upstream manhole is located within a driveway across a roadway and traditional bypass pumping would involve disruption to residential traffic and the use of a private driveway.

​

Coordination with the client, contractor, and residents led to an innovative solution to traditional bypass pumping that eliminated the need for the bypass pumping hose to be installed in a roadway and minimized impacts to the resident’s driveway. The project was completed from 2022–2023, with key team members including Diane Moeller and Paul Ruscko.