top of page

Morton Grove - Niles Water Commission

 

Overview

Robinson was part of a 5-firm team charged with completing Phase 1
within four months, Phase 2 within 6 months, and construction within 10
months


• Performed survey, geotechnical, and permitting for entire route, and full
  design for 2 of 7 contracts

Scope
• Managed company resources across multiple departments and
  interfacing with consulting team and clients
• Project consisted of 8.5 miles of 30” and 24” water main, 7MG standpipe,
   booster pumping station and CIPP lining of two miles of existing 24”
   water main
• Replaced over 60 lead service lines along project route through Skokie, IL
• Major crossings included Edens Expressway, I-294, north branch of
  Chicago River, and multiple railroads

 
Results

• Aggressive design and construction timetables were met
• Morton Grove Niles towns save $22,000/ day using new water source
bottom of page