South Holland Town Center Redevelopment

 

This project consists of the redevelopment of the Village of South Holland downtown area. South Park Avenue, an unmarked state route, along with other adjacent residential streets required complete reconstruction to serve the future infrastructure needs of the Town Center Redevelopment. The improvements include roadways, streetscape, watermain, street lighting, parking lots, storm sewers, stormwater detention, and sewer lining. Robinson Engineering, Ltd. surveyed, designed, prepared plats, bid, and oversaw nine (9) separate construction contracts over a three year time frame.

KEY PROJECT ELEMENTS

  • Reconstructed 900 feet of South Park Avenue within three months under a full detour, Labor Day to Thanksgiving 2006

  • Construct two new storm sewer outfalls to the Little Calumet River and a detention pond at Veterans Park

  • Prepared all right-of-way documentation for redevelopment and re subdivisions

  • Construct two new watermain segments crossing under U.S. Route 6 (162nd Street) at night

  • Construct new segment of roadway on 161st Street between South Park Avenue and Louis Avenue

  • Obtain permits from IDOT, MWRD and IEPA

  • Utility coordination for the burying of overhead utility lines: ComEd, Comcast and WOW cables, and AT&T

  • Ornamental street lighting throughout the project corridor