Minooka - I-80 North Utility Extensions

 

The project extended utilities and infrastructure around a major highway, addressing limitations in service and supporting future development opportunities.

​

The project scope included installation of approximately 8,400’ of 20”-27” diameter sanitary sewer and 5,900’ of 12”-16” diameter water main, along with lift station abandonment and utility service extension to a Village park. Additional work included installation of a grinder pump station, approximately 400’ of 6” sanitary sewer and 780’ of 1.25” force main, approximately 1,100’ of 8” water main and 560’ of 1.5”-2” HDPE water service, and approximately 830’ of augers ranging from 20”-48” diameter crossing I-80 and Ridge Road, as well as rock excavation.

​

The project was locally funded via impact fees, with costs spread over the service area to improve development opportunities and allow developers to share cost and workload, and it provides a secondary (redundant) loop for a 16” water main from one of the Village’s primary deep wells and treatment facilities north of I-80. These efforts resulted in water main and sanitary sewer extensions enabling development for more than 2,000 acres within the Village’s FPA north of I-80, previously limited due to absence of or insufficient utility service, abandonment of an aging lift station, and addressing ongoing developer concerns with design requiring I-80 crossing within bedrock as well as utility installation at the rock/soil interface.

image.png
bottom of page